CLIENT: |
Sadelmi Spa |
Country: |
Italy |
Discipline: |
Engineering - Multidiscipline - 3D |
Period: |
05/07 - |
Amount: |
€ 1.030.000,00* |

CLIENT: |
Oikothen |
Country: |
Italy |
Discipline: |
Engineering - Multidiscipline |
Period: |
01/07 - |
Amount: |
€ 320.000,00* |
CLIENT: |
Alstom Power Italia |
Country: |
Italy |
Discipline: |
Engineering - Civil - 3D |
Period: |
07/06 - |
Amount: |
€ 320.000,00* |

CLIENT: |
Alstom Power Centrales |
Country: |
Oman |
Discipline: |
Engineering - Civil - 3D |
Period: |
03/06 - |
Amount: |
€ 600.000,00* |

CLIENT: |
Tecnimont |
Country: |
Ksa |
Discipline: |
Engineering - Mechanical/civil |
Period: |
02/06 - 09/06 |
Amount: |
€ 485.000,00* |
CLIENT: |
Rosetti Spa |
Country: |
Denmark |
Discipline: |
Engineering - Multidiscipline 3D |
Period: |
02/06 - Ongoing |
Amount: |
€ 440.000,00* |

CLIENT: |
Sef s.r.l. |
Country: |
Italy |
Discipline: |
Construction and laying of 20" oil pipes |
Period: |
2008-2009 |
Amount: |
€ 2.500.000,00 |

CLIENT: |
Yara Italia Spa |
Country: |
Italy |
Discipline: |
Mechanical assembly |
Period: |
2008 |
Amount: |
€ 110.000,00 |

CLIENT: |
Hera Spa |
Country: |
Italy |
Discipline: |
Demolition |
Period: |
03/08 -07/08 |
Amount: |
€ 595.300,00 |
CLIENT: |
Juventus F.C. |
Country: |
Italy |
Discipline: |
Demolition |
Period: |
12/2008 - 12/2009 |
Amount: |
€ 2.100.000,00 |
CLIENT: |
Hera Spa |
Country: |
Italy |
Discipline: |
Demolition |
Period: |
01/2009 - Ongoing |
Amount: |
€ 680.000,00 |
CLIENT: |
AMSA S.p.a. |
Country: |
Italy |
Discipline: |
Demolition and reclaim of thermal destruction plant's structures: tanks reclaiming, pipelines cleaning, soil reclaiming and construction of a methane plant to refuel the vehicles. |
Period: |
06/07 - Ongoing |
Amount: |
€ 9.122.854,00 |
CLIENT: |
Provincia autonoma di Bolzano |
Country: |
Italy |
Discipline: |
Area reclaim |
Period: |
09/05 - 07/08 |
Amount: |
€ 3.117.046,00 |
CLIENT: |
Sviluppo Genova |
Country: |
Italy |
Discipline: |
Plants and hangars decommissioning |
Period: |
12/06 - 06/07 |
Amount: |
€ 500.000,00 |
CLIENT: |
Gela refinery |
Country: |
Italy |
Discipline: |
150.000 SM tank supply |
Period: |
Long term contract |
Amount: |
€ 27.518.460,00 |

CLIENT: |
Italia zuccheri Spa |
Country: |
Italy |
Discipline: |
Demolition and reclaiming |
Period: |
02/08 - 04/09 |
Amount: |
€ 2.258.000,00 |
CLIENT: |
Eni Spa |
Country: |
Italy |
Discipline: |
Supply, assembly and technical assistance of new tanks |
Period: |
2004-2009 |
Amount: |
€ 25.000.000,00 |

CLIENT: |
Eni Spa Refining & Marketing division |
Country: |
Italy |
Discipline: |
Construction, installation and test of a fuel desulfurization plant |
Period: |
Long term contract |
Amount: |
€ 11.600.000,00 |

CLIENT: |
ENI Refining & Marketing |
Country: |
Italy |
Discipline: |
Mechanical scaffolding construction |
Period: |
2004-2009 |
Amount: |
€ 12.000.000,00 |

CLIENT: |
Technip Kti Spa |
Country: |
Colombia |
Discipline: |
Manufacturing and assembling of completed piping modules, electro tooling works and caulking. |
Period: |
2008 |
Amount: |
€ 1.600.000,00 |

CLIENT: |
Società S.I.L.P. Spa Roma |
Country: |
Italy |
Discipline: |
Project, supply and assembly of a steel bridge (Weight: 3.500 Tons; Length: 350m) over the River Tevere |
Period: |
1999 |
Amount: |
€ 600.000,00 |

CLIENT: |
LITWIN Switzerland S.A. |
Country: |
Saudi Arabia |
Discipline: |
Design and supply of 12 tanks of different size |
Period: |
2008 |
Amount: |
€ 1.300.000,00 |

CLIENT: |
Hera Spa of Bologna |
Country: |
Italy |
Discipline: |
Assembly and supply of all the tools necessary to realize the line number 4 of the waste incinerator |
Period: |
2007-2008 |
Amount: |
€ 17.988.694,00 |

CLIENT: |
Hera Forlì Cesena Srl Unipersonale |
Country: |
Italy |
Discipline: |
Extension of an aqueduct system starting from a pre-existing tank. The work included the installation of an overstock tank and the connection to the end user buildings |
Period: |
2006 |
Amount: |
€ 500.000,00 |

CLIENT: |
Midi Srl |
Country: |
Italy |
Discipline: |
Design and construction of an high quality resort in the Verona area |
Period: |
2007 |
Amount: |
€ 4.899.590,00 |

CLIENT: |
Romanina country club Srl |
Country: |
Italy |
Discipline: |
Starting from a rough construction the whole resort has been refined and furnished, using high standard materials. The work also included the construction of the swimming pool |
Period: |
2008 |
Amount: |
€ 1.900.000,00 |

CLIENT: |
Intesa San Paolo Spa |
Country: |
Italy |
Discipline: |
Design and construction of all the systems (electrical, mechanical, data, intruder alarm, fire, surveillance, TV Sat, conditioning) and finishing in several branches located throughout the North of Italy. |
Period: |
2007-2009 |
Amount: |
€ 3.257.000,00 |

CLIENT: |
Banca Popolare di Verona e Novara |
Country: |
Italy |
Discipline: |
Design and construction of all the systems (electrical, mechanical, data, intruder alarm, fire, surveillance, TV Sat, conditioning) and finishing in several branches located throughout the North of Italy. |
Period: |
2006-2007 |
Amount: |
€ 3.352.000,00 |

CLIENT: |
Enel Spa C.T.E |
Country: |
Italy |
Discipline: |
Design and supply of 18 water storage tanks of different capacities |
Period: |
2006 |
Amount: |
€ 5.000.000,00 |

CLIENT: |
Saipem |
Country: |
Italy |
Discipline: |
Construction and assembly of piping, machines and equipment |
Period: |
Nov 09 - Ongoing |
Amount: |
€ 1.720.000,00 |

* This amount refers just to the engineering phase of the work
|